Repairs – Reinforcement – Additions To Existing Buildings

In cases of existing buildings where the architectural design causes the need for structural addition, the Mixed Construction solution is now the most widely used solution.

We distinguish the following types of addition:

The height increase for adding one or more floors inside or outside the existing building.

WORK: HEIGHT ADDITION PALEO FALIRO

The horizontal addition is the extension where a new building is constructed in horizontal contact with the existing one.
In addition, the case where the horizontal and the height addition occur at the same time is more and more common, e.g. horizontal extension of the ground floor and first floor with simultaneous addition of a floor to an existing ground floor building.

Επισκευές – Ενισχύσεις – Προσθήκες-Σε-Υφιστάμενα-Κτίρια-02

WORK: HORIZONTAL & HEIGHT ADDITION KINETA

Επισκευές – Ενισχύσεις – Προσθήκες-Σε-Υφιστάμενα-Κτίρια-03

WORK: HORIZONTAL & HEIGHT ADDITION ARGOS

Static Adequacy
In order to assess the static adequacy of an existing building, the static adequacy study should be carried out in accordance with applicable law.
Before performing the static adequacy study, the specialized smartbuilding engineers collect – with the help of the owners – all the necessary data, such as:

  • Existing Building Permit.
  • Topographic Diagram.
  • Architectural Study.
  • Static Study.

This is followed by a thorough examination of all the data of the studies and their confirmation during an autopsy performed by a team of smartbuilding engineers.

Static Reinforcement of an Existing Building Reinforced Concrete Bearing Organization

In case the static adequacy study of the existing building reveals structural deficiencies that concern either individual structural members or the whole building and in particular its behavior in dynamic stress (Design Earthquake), the required structural reinforcement study is prepared.

REINFORCEMENT OF CONSTRUCTION MEMBERS (1): PALEO FALIRO
REINFORCEMENT OF CONSTRUCTION MEMBERS (2): PALEO FALIRO
REINFORCEMENT OF CONSTRUCTION MEMBERS (3): PALEO FALIRO

During the structural reinforcement works, the design department is always in close collaboration with the responsible supervising engineers, in order for the reinforcement study to be implemented without exceptions.

Construction and Erection of Metal Frame Superstructure

The construction and implementation of the metal addition frame is performed exclusively by specialized construction and implementation crews with extensive experience in dealing with challenges that always arise in complex projects involving additions to existing buildings.

APPLICATION OF METAL FRAME ADDITION (1): OLD FALIRO
APPLICATION OF METAL FRAME ADD (2): PALEO FALIRO

Sample Works

  • Pre-earthquake reinforcement, extension of staircase and height of 2nd floor
  • Addition in height and consequently on an existing ground floor.